Admin Control Tower
Manage program launch, track applications, and monitor 14-day KPIs.
Admin Sections
Dashboard Overview
KPIs, status distribution, and quick actions
Live Pipeline & KPI Tracker
Track applications, review status, and manage 14-day clock
Live Pipeline & KPI Tracker
| App ID | Founder | Project | Theme | Date Received | Days | KPI Status | Reviewers | Score | Status | Actions |
|---|
Program Launch Checklist
Configure program identity, requirements, and scoring logic
Master Program Launch Checklist
Program Identity
Strategy
Requirements (SOP-01)
Scoring Logic
Review Team (SOP Step 2)
Admin Tasks
Scoring Weights Configuration
Based on V2 2024 Tech Dev Scorecard
Adjust weights to change scoring emphasis.
Scoring Guide
Each criterion is rated 1-5. The weighted score is calculated by multiplying the rating by the weight.
High Hurdle: ≥86.4 | Yellow Zone: 64.8-86.4 | Low Hurdle: <64.8
Form Configuration
Fields, sections, terms, and content editor
Application Form Fields
Configure which fields are mandatory (*) for inventor submissions.
How it works: Fields marked as "Required" will show a red asterisk (*) and applicants must complete them before submitting. The POC (Proof of Concept) requirement threshold determines at what TRL level the POC document becomes mandatory.
General Information
Product & Technology
Project Idea Details (NUSAHEM)
Market & Commercialization
Founding Team
Business & Financials
Document Uploads
Personal Documents (NUSAHEM)
Terms & Conditions
Best Practices
- • Keep required fields to a minimum to reduce applicant friction
- • Make document uploads optional initially, then require them for shortlisted candidates
- • The POC document requirement automatically applies based on TRL level selected by applicant
- • Changes take effect immediately for new applications
AI-Driven Screening Matrix
Automated intelligent filtering and ranking of applicants
Automated filtering based on submission quality, completeness, and venture potential.
| Rank | Applicant | Project | AI Score | Quality Matrix | Key Insights | Recommendation | Actions |
|---|---|---|---|---|---|---|---|
|
Click "Run AI Analysis" to generate the screening matrix |
|||||||
AI Screening Methodology
- • Required fields completion rate
- • Document uploads verification
- • Word count thresholds
- • Business model clarity
- • Market opportunity size
- • Competitive differentiation
- • Innovation level assessment
- • Founder experience match
- • Academic credentials
- • Technical capability indicators
- • Commitment signals
General Forms (28)
Product Development Forms & Templates
Complete documentation suite for Deep-Tech Venture Program. All forms are editable and can be replicated for multiple projects.
01. Productization Assessment
Phase 0 screening & feasibility assessment for TRL 2-3 technologies.
02. Product Requirement Doc
PRD for Phase 1 product definition & validation (TRL 3 to 4).
03. Engineering Roadmap
Technical development timeline and milestone planning.
04. Risk Register
Ongoing risk management & mitigation tracking.
05. Validation Test Plan
Testing strategy and validation protocols.
06. Design Review Template
Engineering design review documentation.
07. BOM Cost Model
Bill of materials and cost structure analysis.
08. Manufacturing Readiness
Manufacturing readiness assessment checklist.
09. Supplier Evaluation
Supplier assessment and qualification form.
10. Regulatory Planning Matrix
Regulatory requirements and compliance roadmap.
11. Certification Dossier
Product certification documentation checklist.
12. Field Validation Report
Field testing results and validation documentation.
13. Failure Analysis Report
Root cause analysis and failure investigation.
14. Change Control Form
Engineering change request and approval tracking.
15. Cost Governance Tracker
Cost monitoring and budget governance.
16. Quality Control Plan
Quality management and control procedures.
17. Production Readiness
Production readiness verification checklist.
18. Version Release Approval
Software/hardware release approval form.
19. Warranty & Reliability Plan
Warranty policy and reliability monitoring.
20. Continuous Improvement
Post-launch improvement tracking system.
Screening Review Procedure
Phase 0: Technology screening & productization assessment.
Product Definition Governance
Phase 1: Product definition & validation governance.
Manufacturing Readiness Assessment
Phase 2: Manufacturing readiness evaluation.
Field Validation Procedure
Phase 3: Field validation protocols & procedures.
Industrialization Procedure
Phase 4: Scale-up & industrialization process.
Document Control
Cross-phase document management & version control.
Cost Governance
Cross-phase cost monitoring & budget governance.
Risk Governance
Cross-phase risk management & mitigation governance.
Saved Form Instances
No saved instances yet. Create a new instance or edit a template to save.